Insights for UK Industrial CGI Buyers

Field notes from StratumCGI on how UK developers, occupiers, architects, and planning consultants commission and present industrial CGI for warehouse, distribution, cold-chain, and data-centre schemes. Written from the studio side of the brief, with a pre-let voice and a planning-permission grounding.

Studio
First-hand commissioning notes
UK
English planning system, UK occupier vocabulary
Pre-let
Occupier pitch, planning pack, investor IC deck
Editorial scope

Three threads run through the corpus

Each thread carries the StratumCGI voice that competitor design-build firms cannot write, because the lens is occupier-facing and presentation-led rather than engineering-led.

  • Thread 01

    Typology guides

    Which warehouse, distribution, cold-store, or data-centre type is in play, what each is commissioned for, and what the CGI must show for the brief to land. UK-specific occupier mapping, not a generic taxonomy.

  • Thread 02

    Pre-let presentation

    How developers pitch a scheme to occupiers, planning officers, and investors. What the occupier pitch deck needs, what the planning committee pack must depict, and how the same model serves three audiences.

  • Thread 03

    Spec to CGI translation

    Which decisions a developer makes that the CGI must visualise correctly. Layout, dock count, blast cell placement, racking density, refrigeration plant, AS/RS aisle geometry, and where the brief usually under-specifies.

Latest

Featured note

Pipeline

Publishing soon

Three additional notes are in production. They publish on a sequenced cadence, after the typology guide proves its query band.

  • In production

    Refrigerated warehouse layout for pre-let CGI

    Layout decisions a developer makes that the CGI must show correctly. IMP envelope, glycol subfloor, vapor barrier, in-rack fire suppression, dock-door count, blast-cell placement, and AS/RS aisle width.

  • In production

    How developers present cold-store schemes

    The pre-let stakeholder communications playbook. Occupier pitch, planning committee pack, investor IC deck. What each audience reads first, and how to avoid scheme drift across the three packs.

  • In production

    Cold storage best practices for UK pre-let

    A pre-commission checklist for UK developers. Planning compliance, MEES 2030, occupier fit-out responsibilities, BREEAM cold-store, refrigeration plant noise mitigation.

Where this connects

Bridges to the StratumCGI services

Insights complement the service pages. For commissioning, pricing, and brief intake, follow the bridges below.

Commission StratumCGI for industrial CGI

Brief StratumCGI on a warehouse, distribution, cold-chain, or data-centre scheme. UK developers, architects, and planning consultants get a quote inside three working days.

Request a quote